Production and storage complex including silo tower

For SCHÄFER KALK, a manufacturer and bottler of lime products for the food and pharmaceutical industries, we built a state-of-the-art production and storage complex in a very small space directly next to the quarry - without interrupting operations. And under great challenges: Above all, the construction on the already almost exhausted construction site near the quarry's demolition edge was logistically demanding; a heavy-duty bypass on supports was built especially for this purpose.

The core of the project was the construction of the “silo tower”; a 20 meter high process building with 4 intermediate levels and a concrete ceiling 20 meters high, including a façade with external stairs, strip lighting, doors and ventilation ducts.

On top of this and embedded in the concrete ceiling, ten 20-metre-high silos were built on site, which are operated at a level height of around 40 meters.

In addition, a packing and bagging hall including facades will be assembled in two further construction phases.

Bauherr Developer SCHAEFER KALK GmbH & Co. KG
Leistung Service Structural Steelwork
Tonnage 460 t
Place of construction Diez, Rhineland-Palatinate

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

Structural Steelwork.

Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Read more

Structural Steelwork Production.

Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

Read more

About C + P.

CHRISTMANN + PFEIFER has been synonymous with expertise in industrial and commercial construction since 1925. When you build with us you will benefit from our experience, know-how and a high degree of flexibility.

Read more