New Steel Hall Construction as Plant Extension

The Ford plant in Cologne needed another hall - and we were entrusted with the steel structure for the building: a total of 1,050 tons of steel for the structure, which spans an area of 14,000 square metres. We manufactured, supplied and installed the entire hall structure as well as seven roof-mounted ventilation platforms.

The roof-mounted ventilation units each consist of a self-supporting steel platform structure that rests directly on the building supports in the axis grids. The weatherproof ventilation units are installed here, with an approx. 1.5 meter wide walkway around the units for maintenance purposes. Trapezoidal steel sheets were used as the roof shell.

Bauherr Developer Ford-Werke GmbH
Leistung Service Structural Steelwork
Tonnage 1,050 t
Place of construction Cologne, North Rhine-Westphalia

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

Structural Steelwork.

Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Read more

Structural Steelwork Production.

Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

Read more

About C + P.

CHRISTMANN + PFEIFER has been synonymous with expertise in industrial and commercial construction since 1925. When you build with us you will benefit from our experience, know-how and a high degree of flexibility.

Read more