
New production hall built in steel
In Rudolstadt, Thuringia, we built this new production hall with dimensions of 54 x 30 meters and a resulting floor area of 1,620 square meters for our client Siemens Healthineers AG.
During the approximately six-month construction period, the contract included
- the steel construction for the hall,
- the façade construction,
- the roof waterproofing and the installation of skylights and gates,
- the locksmith services for railings and stairs.
The façade structure was conducted architecturally playful with an individualized wave combination.
The hall has now been put into operation and 50 employees produce electron accelerators for cancer therapy here.
Developer | Siemens Healthineers AG | |
Service | Structural Steelwork | |
Tonnage | 300 t | |
Place of construction | Rudolstadt, Thuringia |
CHRISTMANN + PFEIFER.
The ideal network of specialists for your building project.

Structural Steelwork.
Due to its sustainable characteristics, flexibility of use and economic efficiency, we rely on steel as the ideal material for industrial buildings.

Structural Steelwork Production.
Thanks to our own production sites in Germany, we can flexibly handle production capacities at any time and implement projects with pinpoint accuracy.

About C + P.
CHRISTMANN + PFEIFER has been synonymous with expertise in industrial and commercial construction since 1925. When you build with us you will benefit from our experience, know-how and a high degree of flexibility.