Hall Complex with Office Building
Turnkey Erection of a Hall Complex with Office Building
For the cosmetics manufacturer based in Saxony we undertook the construction of a three-aisled hall complex with 2-storey office and social section. The basis of the building is formed by the reinforced concrete skeleton structure with prefabricated concrete elements. Our services as project controller also encompassed
- Insulated walls
- KS light strips and aluminum windows
- Trapezoidal sheet metal roof with membrane seal
- Ceiling light strips with SHE function
- Vacuum rain drainage system
- Hall base with underfloor heating
- Sanitary installations
- Ventilation and electric installation
- together with outside facilities
Developer | MBR Medical Beauty Research GmbH | |
Service | Turnkey Construction | |
Place of construction | Bad Schlema, Saxony |
CHRISTMANN + PFEIFER.
The ideal network of specialists for your building project.
Turnkey.
We realize customer-specific concepts as a complete turnkey solution with a high degree of certainty in terms of meeting schedules and budgets and in any desired construction material.
Sites.
Construction requires regional support, so CHRISTMANN + PFEIFER is represented via several branches and production facilities throughout Germany.