Hall Complex with Office Building

Turnkey Erection of a Hall Complex with Office Building

For the cosmetics manufacturer based in Saxony we undertook the construction of a three-aisled hall complex with 2-storey office and social section. The basis of the building is formed by the reinforced concrete skeleton structure with prefabricated concrete elements. Our services as project controller also encompassed

  • Insulated walls
  • KS light strips and aluminum windows
  • Trapezoidal sheet metal roof with membrane seal
  • Ceiling light strips with SHE function
  • Vacuum rain drainage system
  • Hall base with underfloor heating
  • Sanitary installations
  • Ventilation and electric installation
  • together with outside facilities
Bauherr Developer MBR Medical Beauty Research GmbH
Leistung Service Turnkey Construction
Place of construction Bad Schlema, Saxony

CHRISTMANN + PFEIFER.

The ideal network of specialists for your building project.

Turnkey.

We realize customer-specific concepts as a complete turnkey solution with a high degree of certainty in terms of meeting schedules and budgets and in any desired construction material.

Read more

Sites.

Construction requires regional support, so CHRISTMANN + PFEIFER is represented via several branches and production facilities throughout Germany.

Read more