Composite Bridge at Berlin Center Town Hall
Following a prior design competition, the new architecturally designed composite bridge was constructed over the River Spree. The steel structure used was manufactured and installed by CHRISTMANN + PFEIFER within a very short period.
Developer | Senate Administration for Urban Development, Berlin | |
Service | Bridge Building | |
Place of construction | Berlin |
CHRISTMANN + PFEIFER.
The ideal network of specialists for your building project.
Bridge Building.
We assume responsibility for planning, manufacture and assembly of bridge building projects and are capable of delivering within extremely short construction times, thanks to in-house production and innovative solutions.
About C + P.
CHRISTMANN + PFEIFER has been synonymous with expertise in industrial and commercial construction since 1925. When you build with us you will benefit from our experience, know-how and a high degree of flexibility.